STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.
Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.
ALLEGHANY COUNTY
INTERSTATE 64
*NEW* Mile marker 7 to 16, eastbound – Right shoulder closures for debris removal, Monday through Friday from 7 a.m. to 4:30 p.m.
Mile marker 7 to 12, eastbound – Single lane closures for maintenance to various bridges, 7 a.m. to 7 p.m. through April 28.
Mile marker 13 to 17, eastbound and westbound – Alternating lane closures for maintenance to bridges over Jackson River, 6 a.m. to 6 p.m. through April 30.
PRIMARY ROADS
*NEW* Route 159 (Dunlap Creek Road) – Flagger traffic control for culvert replacement and slope repairs between Route 665 (Moss Run Road) and Route 717 (Boone Road), Monday from 8 a.m. to 3:30 and April 5-28 from 8 a.m. to 7 p.m. Work zone is about 4.3 miles south of Route 665.
Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, brush cutting and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for ditch work, pipe replacement and brush cutting. Weekdays from 7:30 a.m. to 3 p.m.
BATH COUNTY
PRIMARY ROADS
Route 220 (Sam Snead Highway) – Flagger traffic control between Route 651 (Burger Lane) and Route 615 (Main Street, Hot Springs) for utility work, from 8:30 a.m. to 7:30 p.m. through October 6.
Various roads – Flagger traffic control for shoulder repairs and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.
ROCKBRIDGE COUNTY
INTERSTATE 64
*NEW* Mile marker 50 to 54, eastbound – Alternating lane closures for milling, paving and pavement-marking operations, April 3-28 from 6:30 a.m. to 6:30 p.m.
INTERSTATE 81
*NEW* Mile marker 174 to 183, northbound and southbound – Right shoulder closures for sign work, Monday through Friday from 8 a.m. to 5 p.m.
*UPDATE* Mile marker 185 to 200, northbound – Right shoulder closures for drainage maintenance, Monday through Friday from 7 a.m. to 4:30 p.m.
*NEW* Mile marker 197 to 200, northbound and southbound – Left lane and right shoulder closures for inspection of Route 712 overpass bridge, Monday night from 8 p.m. to 7 a.m.
Mile marker 197 to 196, southbound – Right shoulder closures for sign work including exit 195 off-ramp, Monday through Friday from 8 a.m. to 5 p.m.
PRIMARY ROADS
Route 11 (Lee Highway) – Southbound alternating lane closures between Conifer Lane and Route 1025 (Boundary Line Lane) for pavement widening, guardrail improvements, installation of rumble strips and pavement markings, 6 a.m. to 8 p.m. through April 20.
Route 42 (Virginia Avenue) – Flagger traffic control between Goshen town line and Route 39 (Maury River Road) for maintenance to bridge over Calfpasture River, 7 a.m. to 5 p.m. through April 7.
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
*NEW* Route 631 (Old Buena Vista Road) – Flagger traffic control between Route 703 (Stuartsburg Road/Forest Grove Road) and Route 763 (Lincoln Road) for inspection of I-81 overpass bridges, Wednesday from 8:30 a.m. to 4:30 p.m.
*NEW* Route 679 (Hops Hill Road) – Flagger traffic control between Route 11 (Lee Highway) and Route 680 (Falling Spring Road) for inspection of I-81 overpass bridges, Thursday from 8:30 a.m. to 4:30 p.m.
Route 699 (Agners Mill Road) – Traffic redirected onto temporary causeway between Route 608 (Forge Road) and dead end for replacement of bridge over tributary to Maury River, 7 a.m. to 5 p.m. through April 6.
Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.
HIGHLAND COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for pothole patching, brush cutting and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads and ditch work. Weekdays from 7:30 a.m. to 3 p.m.