STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.
Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.
ALLEGHANY COUNTY
INTERSTATE 64
No lane closures reported.
PRIMARY ROADS
*UPDATE* Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, brush cutting, ditching and shoulder repairs, 7:30 a.m. to 3 p.m. on weekdays.
SECONDARY ROADS
*NEW* Route 3605 (West Edgemont Drive/South Rayon Drive, Covington) – Flagger traffic control between West Jackson Street and Jackson River Sports Complex for rock and soil testing, 8 a.m. to 5 p.m. Monday through Friday.
*UPDATE* Various roads – Flagger traffic control for ditch work, pipe replacement and brush cutting. Mobile traffic control for mowing, 7:30 a.m. to 3 p.m. on weekdays
BATH COUNTY
PRIMARY ROADS
*NEW* Route 39 (Mountain Valley Road) – Flagger traffic control between intersections with Route 688 (Wild Cat School Road) for rock and soil testing, 7 a.m. to 6 p.m. Monday through Friday.
Various roads – Flagger traffic control for shoulder repairs and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.
ROCKBRIDGE COUNTY
INTERSTATE 64
Mile marker 41 to 57, eastbound and westbound – Shoulder closures for mowing operations, 7 a.m. to 7 p.m. through Monday (December 18).
*UPDATE* Mile marker 42 to 41, westbound – Left lane closures for ditch cleaning and repairs, 7 a.m. to 5 p.m. Monday through Thursday.
INTERSTATE 81
Mile marker 174 to 205, northbound and southbound – Shoulder closures for mowing operations, 7 a.m. to 7 p.m. through Monday (December 18).
PRIMARY ROADS
*NEW* Route 60 (East Midland Trail) – Eastbound right lane closures between Bordens School Lane and Route 699 (Wesley Chapel Road) for cable replacement, 8:30 a.m. to 5 p.m. Monday through Thursday.
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing, 7:30 to 3 p.m. on weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing, 7:30 a.m. to 3 p.m. on weekdays.
HIGHLAND COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for pothole patching, brush cutting and shoulder repairs, 7:30 a.m. to 3 p.m. on weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads and ditch work, 7:30 a.m. to 3 p.m. on weekdays.
This page is available to subscribers. Click here to sign in or get access.