The following is a list of highway work that may affect traffic in Alleghany, Bath and Highland counties district during the coming weeks.
Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
Alleghany County
Interstate 64
— Mile marker 0 to 41, eastbound and westbound – Right shoulder closures for brush removal, Monday to Friday from 7 a.m. to 5:30 p.m.
— Mile marker 15 to 16, eastbound and westbound – Alternating lane closures for maintenance of bridges over Route 18, 7 a.m. to 5 p.m. through August 20.
— Mile marker 17 to 20, eastbound and westbound – Right lane closures for inspection of bridges over Jackson River, Tuesday from 7 a.m. to 5 p.m.
Primary Roads
— Route 220 (Hot Springs Road) – Flagger and pilot-truck traffic control for paving operations between Covington city limits and Route 640 (Falls Road), August 16-September 17 from 6:30 a.m. to 7:30 p.m.
— Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, shoulder repairs and asphalt patching. Weekdays from 7:30 a.m. to 3 p.m.
Secondary
— Route 616 (Rich Patch Road) — Closed between Route 617 (Jamison Mountain Road) and Route 615 (Blue Spring Run Road) for replacement of two bridges over Blue Spring Run. Follow posted detour. Estimated completion August 26.
Various roads – Flagger traffic control for pipe replacements, ditch work and asphalt/pothole patching. Weekdays from 7:30 a.m. to 3 p.m.
Bath County
Primary Roads
— Various roads – Flagger traffic control for pavement patching. Weekdays from 7:30 a.m. to 3 p.m.
Secondary Roads
— Various roads – Flagger traffic control for pavement patching and ditch work. Weekdays from 7:30 a.m. to 3 p.m.
Highland County
Primary Roads
— Various roads – Mobile lane closures for line painting operations on portions of Routes 84, 220 and 250, Monday to Friday from 9 a.m. to 5 p.m.
Various roads – Flagger traffic control for pavement patching, tractor mowing and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.
Secondary Roads
— Route 600 – Single lane closures for paving work between Route 84 (Mill Gap Rd) and 5 miles north of Route 84, August 16-27 from 6 a.m. to 6 p.m.
— Various roads – Flagger traffic control for pipe cleaning, tree removal, pavement patching, ditch work, tractor mowing, and adding stone to unpaved roads. Weekdays from 7:30 a.m. to 3 p.m.
This page is available to subscribers. Click here to sign in or get access.