STAUNTON (VR) – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.
Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.
ALLEGHANY COUNTY
INTERSTATE 64
Mile marker 0 to 41, eastbound and westbound – Shoulder closures for ditch cleaning operations, Tuesday through Friday from 7 a.m. to 5:30 p.m.
*NEW* Mile marker 10 to 37, eastbound – Right lane closures for pavement patching, September 18 – October 15 from 8 a.m. to 8 p.m.
*NEW* Mile marker 42 to 39, westbound – Right lane closures for pavement patching, September 18 – October 15 from 8 a.m. to 8 p.m.
PRIMARY ROADS
Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for pavement resurfacing on parts of Route 684 (Dunbrack Road), Route 791 (Dunbrack Circle), Route 830 (Little Mountain Road), Route 1101 (Valley Ridge Road), Route 1103 (Butternut Hills), Route 1105 (Ridgewood Circle), Route 1106 (Enderley Road), Route 1107 (Mountaineer Drive), Route 1108 (Woodland Road), Route 1109 (Heatherton Drive) and Route 1112 (Country Club Lane), 7 a.m. to 6 p.m. through October 14.
Various roads – Flagger traffic control for ditch work, pavement patching and brush cutting. Mobile traffic control for mowing. Weekdays from 7:30 a.m. to 3 p.m.
BATH COUNTY
PRIMARY ROADS
*NEW* Route 39 (Maury River Road) – Flagger traffic control for tree removal operations between Route 640 (Mill Creek Road) and West Virginia state line, September 12 – 30 from 7:30 a.m. to 4:30 p.m.
Various roads – Flagger traffic control for shoulder repairs and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for pavement resurfacing on parts of Route 601 (Little Back Creek Road), Route 605 (Coles Mountain Road), Route 614 (Cowpasture River Road), Route 618 (Dunns Gap Road), Route 629 (Deerfield Valley Road) and Route 689 (Little Gibraltar Road), 7 a.m. to 7 p.m. through October 14.
Various roads – Flagger traffic control for brush cutting and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.
ROCKBRIDGE COUNTY
INTERSTATE 64
*UPDATE* Mile marker 41 to 57, eastbound and westbound – Shoulder closures for ditch cleaning operations, Monday and Friday from 7 a.m. to 5:30 p.m.
Mile marker 57 to 56, westbound – Shoulder closures for painting of Route 763 bridge, 7 a.m. to 7 p.m. through September 30.
INTERSTATE 81
Mile marker 174 to 205, northbound and southbound – Shoulder closures for ditch cleaning operations, Tuesday through Thursday from 7 a.m. to 5:30 p.m.
Mile marker 174 to 206, northbound and southbound – Overnight alternating lane closures for pavement patching, 8 p.m. to 7 a.m. through night of October 7.
Mile marker 176 to 175, southbound – Overnight right lane closure for spill cleanup, Thursday night from 8 p.m. to 6 a.m.
Mile Marker 203 to 206 including Exit 205, northbound and southbound – Overnight single-lane closures and on- or off-ramp closures for pavement-marking operations, Tuesday through Thursday nights from 8 p.m. to 6 a.m. For ramp closures, follow posted detours. Traffic restrictions are for interchange improvements with estimated completion in October.
PRIMARY ROADS
*NEW* Route 11 (Lee Highway) – Flagger traffic control for tree removal operations between Route 763 (Lincoln Road) and Berky’s Lane, September 12 – 23 from 7 a.m. to 4 p.m.
*NEW* Route 252 (Brownsburg Turnpike) – Flagger traffic control for tree removal operations between Route 710 (Swope Lane) and Route 724 (Sterrett Road), September 12 – 30 from 7 a.m. to 4 p.m.
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Route 606 (Raphine Road) – Overnight alternating lane closures for pavement marking operations in area of I-81 interchange, Tuesday and Wednesday nights from 8 p.m. to 6 a.m. Traffic restrictions are due to interchange improvements with estimated completion in October.
Route 716 (Mount Atlas Road) – Flagger traffic control between Route 11 (Lee Highway) and Route 717 (Old Chapel Road) for painting of I-81 overpass bridge, 7 a.m. to 7 p.m. through September 30.
Route 763 (Lincoln Road) – Flagger traffic control between Route 788 (Warm Run Road) and Route 631 (Old Buena Vista Road) for painting of I-81 overpass bridge, 7 a.m. to 7 p.m. through September 30.
Various roads – Flagger traffic control for pavement resurfacing on parts of Route 710 (Sterrett Road), Route 712 (Decatur Road), Route 717 (McClung Road), Route 729 (Back Draft Road), Route 804 (Shady Lane), and Route 815 (School House Hill Road), 7 a.m. to 6 p.m. through October 14.
Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.
HIGHLAND COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for pothole patching and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for pavement resurfacing on parts of Route 607 (Big Valley Road), Route 614 (Cowpasture River Road), Route 616 (Lower Fork Road), Route 617 (Seldom Seen Road), Route 633 (Moats Lane), Route 635 (Possum Trot Lane), Route 641 (Ruckman Lane) and Route 644 (Hardscrabble Road), 7 a.m. to 6 p.m. through October 14.
Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads, pavement patching, and ditch work. Weekdays from 7:30 a.m. to 3 p.m.
This page is available to subscribers. Click here to sign in or get access.