ALLEGHANY COUNTY, VA (VR) – Local governments in our area have recently held meetings on the possibility of hosting data centers in western Virginia. The Covington City Council has discussed the topic. The Highland County Board of Supervisors held an open hearing on November 4. Every single person who spoke at that hearing was opposed to building data centers in the county.
It would be a surprise to learn that any of those speakers have ever set foot in a data center or gave them any thought prior to the current anti-data center political campaign. I have. My first job at a data center began in 1982, supporting the U.S. Army as a systems engineer working for Electronic Data Systems. During the next two decades, I worked for a series of system software companies as a developer. These were small shops located in the emerging tech corridor from Tysons Corner to Reston, Virginia, that specialized in writing software to support IBM’s mainframe operating systems. Working primarily in assembly code, my colleagues and I developed job accounting systems to help data centers accurately bill their customers, performance management systems to optimize their workloads, and network services to support high-speed communications.
Our customers were system administrators, system programmers, and system operators. The code we wrote ran in thousands of data centers around the world. Some of it still does.
Data centers have been in operation now for generations. They existed before you could even buy a home computer. Today, they function as the quiet infrastructure of modern life. They store, process, and deliver the information that supports everyday activities. Without them, email and messaging would stop, online banking and payments would fail, streaming and social media would go dark, cloud storage and collaboration tools would vanish, navigation and ride-sharing apps would cease, telemedicine and electronic health records would become inaccessible, and e-commerce, logistics tracking, and most remote work would grind to a halt. Many, many other services depend on them, including emergency services, weather forecasting, financial markets, and government and military systems.
The rise of artificial intelligence (AI) and the associated build-out increases demand for compute and power density, but it does not change the underlying case. AI workloads run on the same infrastructure that supports ordinary digital services, and the same efficiency measures (liquid cooling, higher utilization, specialized hardware) apply. Expanding capacity is necessary to obtain AI’s huge productivity, scientific, and practical benefits; the alternative is far slower progress or the use of less efficient distributed computing.
Over time, data centers have become much more efficient due to virtualization: the ability for many independent workloads to share the same single physical server. This raised utilization from the single-digit percentages common in older enterprise setups to much higher levels. The cloud extended this idea: instead of every organization running its own underused servers, large providers operate shared facilities and rent capacity on demand.
It is no longer necessary to know where and how requests for computing services are met, but they do have to be met somewhere. And that somewhere is in a data center.
Attacks on new data center development often make exaggerated claims about electricity and water use. Data centers accounted for just 1.5 percent of global electricity use in recent years. Projected expansions to support AI are expected to raise that share to around 3 percent by 2030—still a small fraction of total demand and a smaller driver of growth than transport, heating, and industry. Electrical efficiency is also improving. The average power usage effectiveness (PUE) has fallen from well above 2.0 to around 1.5, with leading facilities reaching 1.1 through better airflow, higher operating temperatures, free cooling, and liquid cooling. Several states are now requiring developers to fund their own power and infrastructure, so residential customers are not charged for the new load.
Water use is similarly overstated. Direct on-site water consumption by U.S. data centers is estimated in the tens of billions of gallons annually—less than irrigation for almonds in California and a small fraction of what golf courses use. Newer designs use closed-loop liquid cooling or air cooling that consumes little or no water on site after the initial fill.
Data centers are not entirely impact-free. It makes sense to pay attention to the efficiency, power sourcing, and local water conditions associated with any proposal. What does not make sense is for rural communities to reject their economic and infrastructure benefits out of hand without having any real understanding of the subject.
The potential revenues are significant. West Virginia, for example, has enacted a plan that directs 50% of the incremental property-tax revenue from certified high-impact data centers into a fund dedicated to reducing (and potentially eliminating) the state’s personal income tax.
Leaders in our own area should base their decisions about data centers on the actual costs and benefits to their constituents rather than the amount of organized political opposition.
Scott Swett
Covington, Virginia