STAUNTON – The following is a list of maintenance and construction work that may affect traffic in the VDOT Staunton District, which consists of 11 counties in the Shenandoah Valley and Alleghany Highlands.
Scheduled work is subject to change due to inclement weather and material supplies. When traveling through a work zone, use extreme caution and be alert for lane closures and traffic-pattern changes.
*NEW* or *UPDATE* indicates a change from last week’s report.
ALLEGHANY COUNTY
INTERSTATE 64
Mile marker 10 to 13, eastbound – Single lane closures for milling, paving and striping operations, 6 a.m. to 7 p.m. through June 5.
*NEW* Exit 27, eastbound and westbound – Right shoulder closures along off-ramps for sign work 8 a.m. to 5 p.m. Monday through Friday.
PRIMARY ROADS
*NEW* Route 60 (Midland Trail) – Flagger traffic control between Route 651 (Moose Park Road/Steels Lane) and Route 772 (Boys Home Road) for inspection of bridge over railway, 9 a.m. to 5 p.m. Wednesday.
Route 220 (Grafton Street/Market Avenue) – Oversized tractor trailers with police escorts between I-64 exit 27 interchange and Botetourt County line, up to four times daily through May 31. Expect delays.
Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching, brush cutting, ditching and shoulder repairs, 7:30 a.m. to 3 p.m. weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for ditch work, shoulder repairs, pothole repairs, pipe replacement and brush cutting, 7:30 a.m. to 3 p.m. weekdays.
BATH COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for shoulder repairs and pipe cleaning, 7:30 a.m. to 3 p.m. weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. weekdays.
ROCKBRIDGE COUNTY
INTERSTATE 64
*NEW* Mile marker 42 to 41, westbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5 p.m. Wednesday and Thursday.
*NEW* Mile marker 46 to 44, westbound – Right lane closures for shoulder repairs, 7 a.m. to 5 p.m. Tuesday through Friday.
*NEW* Mile marker 50 to 55, eastbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5 p.m. Friday.
INTERSTATE 81
*NEW* Mile marker 174 to 176, northbound – Right shoulder closures for sign work, 8 a.m. to 5 p.m. Monday through Friday.
*NEW* Exit 188A, northbound – Off-ramp narrowed for sign work on left shoulder, 8 a.m. to 5 p.m. Monday through Friday.
Mile marker 205 to 200, southbound – Overnight left-lane closures for rock and soil testing, 8 p.m. to 5 a.m. through night of June 10.
PRIMARY ROADS
Route 252 (Brownsburg Turnpike) – Flagger traffic control for paving operations between Route 39 (Maury River Road) and Route 726 (Beard Road), 7 a.m. to 7 p.m. through Friday.
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. weekdays.
SECONDARY ROADS
Route 646 (Big Hill Road) – Stop-and-proceed traffic pattern between Route 649 (Tom Alphin Road) to Route 647 (Unexpected Road) for bridge replacement at Colliers Creek, 7 a.m. to 5 p.m. through Thursday.
Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting, 7:30 a.m. to 3 p.m. weekdays.
HIGHLAND COUNTY
PRIMARY ROADS
Route 220 (Potomac River Road) – Temporary traffic signal in operation 24/7 between Route 632 (The Pines Road) and Route 629 (Strait Creek Road) for Strait Creek bridge replacement. Estimated completion August 2027.
Various roads – Flagger traffic control for pothole patching, brush cutting and shoulder repairs, 7:30 a.m. to 3 p.m. weekdays.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, and adding stone to unpaved roads, 7:30 a.m. to 3 p.m. weekdays.
AUGUSTA COUNTY
INTERSTATE 64
Mile marker 94 to 97, eastbound – Overnight single lane closures for paving operations, 7 p.m. to 7 a.m. through night of July 2.
INTERSTATE 81
*NEW* Mile marker 210 to 217, northbound – Right shoulder closures for sign work, 8 a.m. to 5 p.m. Monday through Friday.
*NEW* Mile marker 211 to 208, southbound – Right shoulder closures for shoulder repairs, 7 a.m. to 5 p.m. Tuesday through Friday.
*UPDATE* Mile marker 221 to 227, northbound and southbound – Full closure southbound for overhead sign installation and pavement work, 6 p.m. Saturday through 8 a.m. Sunday (May 30-31). Follow posted detour. Single-lane traffic on exit 221 southbound ramp to I-64 east. Shoulder closures and travel-lane shifts northbound and southbound 24/7. Traffic restrictions are for I-81 widening project with estimated completion in summer 2027. Work zone speed limit 60 miles an hour.
Mile marker 232 to 238 – Left shoulder closures 24/7 with overnight lane closures as needed. Work zone speed limit 60 miles per hour. Traffic restrictions are for construction of I-81 truck-climbing lanes with estimated completion of late 2027.
*NEW* Mile marker 233 to 235, northbound – Right shoulder closures including along the exit 235 off-ramp for sign work, 8 a.m. to 5 p.m. Monday through Friday.
PRIMARY ROADS
*UPDATE* Route 11 (Lee-Jackson Highway) – Northbound and southbound single lane closures between Route 620 (Spottswood Road) and Route 1210 (Spitler Circle) for paving operations, 5:30 a.m. to 8 p.m. through July 30.
Route 11 (Lee-Jackson Highway) – Southbound right shoulder closures near Route 262 (Woodrow Wilson Parkway) interchange just south of Staunton for sign installation, 7 a.m. to 5 p.m. Monday through Friday.
Route 254 (Hermitage Road) – Flagger traffic control as needed at intersections with Route 262 (Woodrow Wilson Parkway), Route 792 (Indian Mound Road/Balsley Road) and Route 640 (Old White Bridge Road) for intersection improvements, 8 a.m. to 6 p.m. through June 6.
Route 254 (Hermitage Road) – Pilot truck and flagger traffic control at various locations between Waynesboro city limits and Route 262 (Woodrow Wilson Parkway) for shoulder widening, 9 a.m. to 5:30 p.m. through June 5.
Route 262 (Woodrow Wilson Parkway) – Northbound right shoulder closures near Route 11 (Lee-Jackson Highway) interchange for sign installation, 7 a.m. to 5 p.m. Monday through Friday.
Route 340 (Stuarts Draft Highway) – Overnight flagger and pilot truck traffic control between Route 657 (Indian Ridge Road) and Edelweiss Lane for shoulder widening operations, 8 p.m. to 6 a.m. nights through June 25.
*NEW* Route 340 (East Side Highway) – Overnight single lane closures or flagger traffic control for paving operations between Waynesboro northern city limits and Route 619 (Purple Cow Road), 8 p.m. to 6 a.m. May 27 through July 30.
SECONDARY ROADS
*NEW* Route 600 (Marble Valley Road) – Flagger traffic control near intersection with Route 629 (Deerfield Valley Road) for bridge work, 7 a.m. to 7 p.m. Tuesday through Friday.
Route 612 (Laurel Hill Road, Verona) – Occasional flagger traffic control and westbound turn-lane closures at Route 901 (Mill Place Parkway) for intersection improvements, 6 a.m. to 8 p.m. weekdays through August 1.
*NEW* Route 624 (Mount Torrey Road) – Flagger traffic control between Route 1607 (Inch Run Lane) and Route 1601 (Featherstone Drive) for soil borings at the bridge over Back Creek, 9 a.m. to 4 p.m. Thursday and Friday.
*NEW* Route 629 (Deerfield Valley Way) – Flagger traffic control for bridge work near intersection with Route 716 (West Augusta Road), 7 a.m. to 7 p.m. Wednesday through Friday.
*NEW* Route 635 (Augusta Farms Road) – Flagger traffic control between Route 635 (Kindig Road) and Route 608 (Tinkling Spring Road) for paving operations, 8 a.m. to 4 p.m. May 27 through July 30.
*NEW* Route 657 (Indian Ridge Road) – Flagger traffic control between Route 656 (Offliter Road) and Route 340 (Stuarts Draft Highway), 8 a.m. to 4 p.m. May 27 through July 30.
*NEW* Route 701 (Howardsville Road) – Flagger traffic control for paving operations between Route 11 (Lee-Jackson Highway) and Route 252 (Middlebrook Road), 8 a.m. to 4 p.m. May 27 through July 30.
Route 834 (Hickory Hill Road) – Flagger traffic control between Route 631 (Ladd Road) and Route 634 (Goose Creek Road) for waterline installation, 7:30 a.m. to 4 p.m. through June 30.
Route 901 (Mill Place Parkway, Verona) – Occasional flagger traffic control near Route 612 (Laurel Hill Road) for intersection and roadway improvements, 6 a.m. to 8 p.m. weekdays through August 1.
Various roads – Flagger traffic control for drainage work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 to 3 p.m. weekdays.
The Shadow







