STAUNTON, VA (VR) – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.
Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.
ALLEGHANY COUNTY
INTERSTATE 64
*NEW* Mile marker 0 to 8, eastbound and westbound – Alternating lane closures for utility work, Friday from 7 a.m. to 10 a.m.
*NEW* Mile marker 23 to 25, eastbound and westbound – Right shoulder closures for ditch cleaning operations, Monday from 8:30 a.m. to 5 p.m.
PRIMARY ROADS
Various roads – Flagger traffic control for tree and debris removal, drainage work, pothole patching and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for ditch work, pavement patching, pipe replacement and brush cutting. Mobile traffic control for mowing. Weekdays from 7:30 a.m. to 3 p.m.
BATH COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for shoulder repairs and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting and pipe cleaning. Weekdays from 7:30 a.m. to 3 p.m.
ROCKBRIDGE COUNTY
INTERSTATE 64
*NEW* Exit 55, westbound – Right shoulder closures for sign work along off-ramp, Monday through Friday from 8 a.m. to 5 p.m.
Mile marker 56 to 57, eastbound and westbound – Alternating shoulder closures for painting of Route 763 bridge, 7 a.m. to 7 p.m. through Sunday (October 30).
INTERSTATE 81
*NEW* Exit 180, southbound – Right shoulder closures for sign work along off-ramp, Monday through Friday from 8 a.m. to 5 p.m.
Exit 191, northbound – Shoulder closures along ramp to I-64 westbound for painting of overpass bridge, 7 a.m. to 7 p.m. through Sunday (October 30).
*NEW* Exit 195, northbound – Right shoulder closures for sign work along off-ramp, Monday through Friday from 8 a.m. to 5 p.m.
PRIMARY ROADS
*UPDATE* Route 42 (Virginia Avenue) – Flagger traffic control between Augusta County line and Black Oak Lane for maintenance to bridge over Cove Creek, 7 a.m. to 6 p.m. through November 11.
*UPDATE* Route 42 (Virginia Avenue) – Flagger traffic control between Goshen town limits and Route 39 (Maury River Road) for maintenance to bridge over Calfpasture River, 7 a.m. to 6 p.m. through November 11.
*NEW* Route 60 (Midland Trail) – Westbound right shoulder closures between Route FR-742 (Memorial Lane) and Route FR-743 (Hilltop Lane) for sign work, Monday through Friday from 8 a.m. to 5 p.m.
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
*NEW* Route 669 (Beatty Hollow) – Flagger traffic control between Route 670 (Borden Road) and Route 60 (Midland Trail) for maintenance of bridge over Whistle Creek, Monday through Friday from 7 a.m. to 6 p.m.
Route 763 (Lincoln Road) – Flagger traffic control between Route 788 (Warm Run Road) and Route 631 (Old Buena Vista Road) for painting of I-81 overpass bridge, 7 a.m. to 7 p.m. through Sunday (October 30).
Various roads – Flagger traffic control for grading, pipe replacement, ditch work, tree removal, pavement patching, shoulder repairs and brush cutting. Mobile lane closures for mowing. Weekdays from 7:30 a.m. to 3 p.m.
HIGHLAND COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for pothole patching and shoulder repairs. Weekdays from 7:30 a.m. to 3 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting, pipe cleaning, tree removal, adding stone to unpaved roads, pavement patching, and ditch work. Weekdays from 7:30 a.m. to 3 p.m.
This page is available to subscribers. Click here to sign in or get access.